Blackburn cutting cross section

Project Details

  • CPB (formerly Leightons)
  • Diagram

Created for the Blackburn Level Crossing Removal project, this cross section diagram was designed to answer the question asked by the community as to why there was such a big cutting being made on the Nunawading side of the level crossing.

The problem was finding a translation for the engineering explanation that the trains need to ‘chase the grade’ into something that could be used in community meetings and on posters.

Basics. Know what they are. Get them right. Repeat.

About being sensible.

Tools we use